
Project Presentation
The wastewater treatment project of Fangbei village, anjing town, Pixian County
Its occupation area attains one thousand and eight hundred square meters with its underground area of 0.9 m2/m3. Engineering constuction period: six months
The whole set of facilities is buried underground with its surface land covered with leisure entertainment location. The effluent water is used to make cascades in the lanscaping modelling. There aren’t any bad influences upon surrounding environment, with relatively high satisfaction from the residents. As it also raises the entertainment quality of the community .
Technics Adopted: PASG Technique
Processing Capability:2000 tons/day
Processing Standard and its effects:GB18918-2002 attained by Class A, Grade One
Inspection institution:Environmental Protection Bureau of Pixian County
Time estimated for investment and operation:November 2010
Technics Adopted: PASG Technique
Processing Capability:2000 tons/day
Processing Standard and its effects:GB18918-2002 attained by Class A, Grade One
Inspection institution:Environmental Protection Bureau of Pixian County
Time estimated for investment and operation:November 2010
Project picture:

The Former Article:The wastewater treatment project of the Overseas Chinese Town in Yunan Province
The Next Article:The wastewater treatment project of Yongdu village, Anjing Town, Pixian County
Return:Projects Presentation


The Former Article:The wastewater treatment project of the Overseas Chinese Town in Yunan Province
The Next Article:The wastewater treatment project of Yongdu village, Anjing Town, Pixian County
Return:Projects Presentation
About PASG Technology